| Sl.No. |
Description |
Name of Client |
1 |
Development of Greenfield Bridge across River Ganga connecting proposed Bakhtiyarpur bypass of NH-31 near village Karjan & Tajpur on NH-28 in the State of Bihar. |
Bihar State Road Development Corporation Limited. |
2 |
Project of construction of a Bridge between Dhola and Sadia Ghats along with connecting roads from near about Dhola to Islampur Tinali in Assam under Arunachal Pradesh |
Ministry of Road Transport & Highways, New Delhi |
3 |
Construction of a Bridges across Dibang River System & connecting road between Bomjur-Meka (NH-52) covering length of 18.950 km and Construction of a Bridge across river Lohit at Alubari Ghat and connecting road between Chowkham-Digaru (NH-52) covering length 12.00 km in Arunachal Pradesh. |
Ministry of Road Transport & Highways, New Delhi |
4 |
Rehabilitation, Strengthening and four Laning of Quazigund to Banihai Section of NH-1A from Km 198.350 to Km 204.700, including 2-tunnels (2-lane) of 0.69 Km & 8.45 Km length,on DBFOT (Annuity) basis |
National Highways Authority of India, New Delhi |
5 |
Upgradation, Operation and Maintenance of Km 534.720 to
Km 556.840 of Hyderabad-Bangalore section of NH-7 in Karnataka NHDP Phase-VII on Design, Build, Finance, Operate and Transfer (DBFOT), Toll basis |
National Highways Authority of India, New Delhi |
6 |
Design, Engineering, Finance, Procurement, Constructionn, Operation and Maintenance of four laning of Kundapur Surathkal section of NH-17 from Km283+300 to Km 358+080 (section 1) and Mangalore - Kerala Border (Km 375+300) to Km 376+700 (i.e. Mahaveer Circle to Kerala Border) |
National Highways Authority of India, New Delhi |
7 |
Four laning of Armur - Adloor Yellareddy stetch from Km 308.000 (Armur) to Km 367.000 (Adloor Yellareddy) of Nagpur-Hyderabad section on NH-7 in the State of Andhra Pradesh (the "Project") through Public-Private/Public sector partnership (PPP) on Design, build, finance, Operate and transfer (the "DBFOT") basis under NHDP Phase-II. |
National Highways Authority of India, New Delhi |
8 |
Development of Port Facilities at Krishnapatnam Port, State of Andhra Pradesh, Phase-II on EPC basis. |
Krishnapatnam Port Company Limited |
9 |
Pranahitha - Chevella Lift Irrigation Scheme Link-II Package No–6 on EPC basis. |
SE, I&CAD, Sripada Yellampally Project Circle, Macherial, Adilabad Dist, AP |
10 |
Pranahitha - Chevella Lift Irrigation Scheme Link-VII Package No–21 on EPC basis. |
SE, I&CAD, NSLI, Nizamabad Dist, AP |
11 |
1200MW Teesta Stage-III Hydroelectric Project on EPC basis. |
Teesta Urja Limited |
12 |
STAGE-II, PHASE-I of SRIPADA SAGAR PROJECT on EPC basis.
|
SE, I&CAD, Mancherial, Karimnagar Dist.
|
13 |
Execution of Stage - 2 pumping station (5X30MW) at Jonnalaboguda Balancing Reservoir Near Khanapur Village under EPC/Turnkey Basis, Kalwakurthy Stage 2. |
PA&SE, MGJLIP Circle, Mahabubnagar |
14 |
BLIP-Lift II – Design & Execution of Stage-1& Stage-2 Pumping Station of Lift –II at Thirumalayapally & Kothakota (Vg) of Kothakota (M) Mahabubnagar Dist. on E.P.C. basis. |
Project Administrator & Superintending Engineer(I/c), BLIP Circle, Pebbair, Mahabubnagar Dist. |
15 |
Construction of Chagallu Barrage under PABR Stage –II of Anantapur District(Package No.-33) on EPC basis. |
SE, I&CAD, TBPHLC Circle, Ananthapur |
16 |
Construction of Sri Komaram Bhim Project (Pedda vagu project) near Ada village, Asifabad Mandal, Adilabad district.(Package No.18) on EPC basis. |
SE, I&CAD, MIP Circle, Bellampally, Adilabad Dist. |
17 |
Improvements and Formation of Double lane Road on Krishna Left Flood Bank from km 0.00 to km 58.50 in Krishna District on EPC basis. |
SE, I&CAD, Vijayawada Circle, Krishna District |