| Sl.No. |
Description |
Name of Client |
1 |
Four laning of Armur - Adloor Yellareddy stetch from Km 308.000 (Armur) to Km 367.000 (Adloor Yellareddy) of Nagpur-Hyderabad section on NH-7 in the State of Andhra Pradesh (the "Project") through Public-Private/Public sector partnership (PPP) on Design, build, finance, Operate and transfer (the "DBFOT") basis under NHDP Phase-II. |
National Highways Authority of India, New Delhi |
2 |
Development of Port Facilities at Krishnapatnam Port, State of Andhra Pradesh, Phase-II on EPC basis. |
Krishnapatnam Port Company Limited |
3 |
Pranahitha - Chevella Lift Irrigation Scheme Link-II Package No–6 on EPC basis. |
SE, I&CAD, Sripada Yellampally Project Circle, Macherial, Adilabad Dist, AP |
4 |
Pranahitha - Chevella Lift Irrigation Scheme Link-VII Package No–21 on EPC basis. |
SE, I&CAD, NSLI, Nizamabad Dist, AP |
5 |
1200MW Teesta Stage-III Hydroelectric Project on EPC basis. |
Teesta Urja Limited |
6 |
Design, Engineering, Finance, construction, Operation and maintenance of the 4-lane elevated highway from km 10.000 to km 14.000 and 6 lane access controlled highway from km 14.000 to km 29.500 on BOT basis (B'lore-Nelmanagala). |
National Highways Authority of India, N. Delhi |
7 |
STAGE-II, PHASE-I of SRIPADA SAGAR PROJECT on EPC basis.
|
SE, I&CAD, Mancherial, Karimnagar Dist.
|
8 |
Execution of Stage - 2 pumping station (5X30MW) at Jonnalaboguda Balancing Reservoir Near Khanapur Village under EPC/Turnkey Basis, Kalwakurthy Stage 2. |
PA&SE, MGJLIP Circle, Mahabubnagar |
9 |
BLIP-Lift II – Design & Execution of Stage-1& Stage-2 Pumping Station of Lift –II at Thirumalayapally & Kothakota (Vg) of Kothakota (M) Mahabubnagar Dist. on E.P.C. basis. |
Project Administrator & Superintending Engineer(I/c), BLIP Circle, Pebbair, Mahabubnagar Dist. |
10 |
Construction of Chagallu Barrage under PABR Stage –II of Anantapur District(Package No.-33) on EPC basis. |
SE, I&CAD, TBPHLC Circle, Ananthapur |
11 |
Construction of Sri Komaram Bhim Project (Pedda vagu project) near Ada village, Asifabad Mandal, Adilabad district.(Package No.18) on EPC basis. |
SE, I&CAD, MIP Circle, Bellampally, Adilabad Dist. |
12 |
Design, Engineering, Construction, Development, Finance, Operation and Maintenance of 4 Lanning the existing 2 lane section Km 285 (near Padalur) to Km 325 ( near Trichy) on NH-45 in the state of Tamilnadu on Build, Operate and Transfer(BOT) Basis. |
National Highways Authority of India, 1, Eastern Avenue, Maharanibagh,New Delhi – 110 065. |
13 |
Improvements and Formation of Double lane Road on Krishna Left Flood Bank from km 0.00 to km 58.50 in Krishna District on EPC basis. |
SE, I&CAD, Vijayawada Circle, Krishna District |