Bridge across River Godavari between
Yanam and Yedurlanka in East Godavari Dist.(A.P) on
BOT Basis |
Engineer-in-chief (R & B),(Admn.
& EAP), Govt. of A.P. Hyderabad. |
1.80 Km long high level bridge across
River Godavari with 9.40 KM long approaches Completed
Three months ahead of schedule |
Supply of Make-up Water System Turnkey
Package for Simhadri Thermal Power Project, Stage-1
for NTPC Visakhapatnam (2 x 500 MW) |
National Thermal Power Corporation,
New Delhi |
Complete makeup water system to supply
9000 Cum/Hr of seawater and 1500 Cum/Hrs sweet water
involvong Multi disciplinary engineering and construction |
Bridge across River Krishna between
Puligadda and Penumudi in A.P on B O T Basis |
Govt. of A.P. R& B, Dept. |
3.00 Km long High level Bridge across
River Krishna with 2.0 KM long Approaches.
Bridge work completed in less than a year. |
Construction of 17.30
Km long Nellore Bypass project on B O T (Annuity) Basis |
N.H.A.I. New Delhi |
Construction of 840 meters
long three lane twin bridge across River Pennar along
with minor bridges, Railway Over Bridge, Under passes
and other CD works
Completed three months ahead of schedule |