Special Foundations
Marine Structures
Infrastructure Works
Project on In-House Design

 

Projects on EPC/Turnkey and Build Operate & Transfer (BOT) basis
 Name of Project
Client
Details
Bridge across River Godavari between Yanam and Yedurlanka in East Godavari Dist.(A.P) on BOT Basis
Engineer-in-chief (R & B),(Admn. & EAP), Govt. of A.P. Hyderabad.
1.80 Km long high level bridge across River Godavari with 9.40 KM long approaches Completed Three months ahead of schedule
Supply of Make-up Water System Turnkey Package for Simhadri Thermal Power Project, Stage-1 for NTPC Visakhapatnam (2 x 500 MW)
National Thermal Power Corporation, New Delhi
Complete makeup water system to supply 9000 Cum/Hr of seawater and 1500 Cum/Hrs sweet water involvong Multi disciplinary engineering and construction
Bridge across River Krishna between Puligadda and Penumudi in A.P on B O T Basis
Govt. of A.P. R& B, Dept.
3.00 Km long High level Bridge across River Krishna with 2.0 KM long Approaches.

Bridge work completed in less than a year.
Construction of 17.30 Km long Nellore Bypass project on B O T (Annuity) Basis
N.H.A.I. New Delhi
Construction of 840 meters long three lane twin bridge across River Pennar along with minor bridges, Railway Over Bridge, Under passes and other CD works

Completed three months ahead of schedule