Year |
Name of the Project |
Client |
2011 |
Pile Foundation Package (Package-D) Fir 400 Kv D/C (Triple Snowbird) Mundra-Limbdi Transmission Line Under Scheme-1 Associated With Mundra Ultra Power Project |
Power Grid Corporation of INDIA Limited, Saudamini, Plot No.2, sector-29, Gurgaon-122 001, Haryana |
2011 |
Pile foundation work at Five Tower Locations (3 in Water & 2 on Land) of 1.2 M dia on Ganga river Crossing for WBSETCL Contract of 200KV D/C transmission line between Kakdeep (lot-8) and Kachuberia at Sagar Island in the District of 24-Paraganas (South) in West Bengal against WBSETCL's Erection LOA No. TR.PROJ/TL/Sagar/Erection/T-172/342 dated 15.05.2008 |
Kalpataru Power Transmission Limited, 81, Kalpataru Synergy, Opp. Grand Hyatt, Santacruz (E), Mumbai 400055, India |
2010 |
Pile foundation (Package-B1) for River Crossing Locations for 400KV S/C (Quad) Sasaram-Biharshariff Transmission Line associated with Supplementary Transmission System for DVC & Maithon Right Bank Project. Specification No.: C-47303-L191-3 |
Power Grid Corporation of INDIA Limited, Saudamini, Plot No.2, sector-29, Gurgaon-122 001, Haryana |
2010 |
Pile Foundation (Package-B) for River Crossing locations for 765kv S/C Gaya-Sasaram & 765kv S/C Gaya-Balia Transmission Lines associated with Common Scheme for 765kv Pooling Stations and Network for NR and Common Scheme for Network for WR". Specification No.: C-47201-L091-3 |
Power Grid Corporation of INDIA Limited, Saudamini, Plot No.2, sector-29, Gurgaon-122 001, Haryana |
2010 |
Installation of bored RCC cast in situ piles for Bengal NRI Complex at Anadpur, Kolkata |
Bengal NRI Complex Limited, Kolkata |
2010 |
Pile Foundation work in 22KV D\C Dalkola-Purnea Transmission Line at Tower Location No.35 at Baisi/Purnea |
Power Grid Corporation of India Limited, Gurgaon, Haryana |
2010 |
Piling works for construction of 270 MW Thermal Power Project at Tamminapatnam and Mummidi Village, Chillakuru Mandalam, Nellore District |
Madhucon Projects Limited, Hyderabad. |
2009 |
Extension of North Breakwater and construction of KPCL ware houses at Krishnapatnam port |
Krishnapatnam Port Company Limited, Hyderabad |
2009 |
Construction of Diaphragm Wall of proposed IT-ITES Multistoried Building “Prestige Polygon” at Door No: 471, Anna Salai, Teynampet, Chennai-600 018 |
B.L. Hashyap & Sons Ltd, F-002, Eden Hall, 245, Defence Colony. |
2009 |
Construction of Diaphragm wall, Steel Strutting and Allied Works at Prestige Center Court, Central Street, Shivajinagar, Bangalore |
Prestige Estates Projects Pvt Ltd,The Falcon House. |
2009 |
Civil foundation part of the work of “ Service Contract LOA Ref:: N1/C&M/O&M/08-09/LOA-II/111 dated 14.08.2008 for the work of Shifting of (i) 400 KV D/C Singrouli-Anpara/Allahabad-I(Powergrid) transmission line (ii) 132 KV S/C Singrauli-Pipri Line (NTPC) in UPRVUNL’s Anpara ‘D’ Thermal Power Project area – Deposit work of UPRVUNL” |
KEC International Ltd,New Delhi. |
2009 |
RCC cast in situ Long Bored Piles for Towers
(7 Nos) for Construction of Multi-Storeyed Group Housing Complex “ UNITECH GRANDE” Sectors 96,97 & 98, NOIDA
|
Unitech Hi-Tech Developers Ltd |
2009 |
Pile Foundation Package for 400 KV D/C Baripada-Mendhasal Transmission Line Associated with Eastern Region Strengthening Scheme-I |
Power Grid Corporation of India Limited, Gurgaon, Haryana |
2009 |
Pile foundation for 400 KV D/C Transmission Line – Package-B – (part-II) |
Power Grid Corporation of India Limited, Gurgaon, Haryana |
2009 |
Pile foundation for Tata Blue scope Limited (Part-II) |
Jamshedpur utilities & services. Northen Town, Bistupur, Jamshedpur |
2008 |
LSTK1-Sea Water Intake, Outfall and Product Water Conveyance System for CPCL, Chennai |
CPCL, Manali, Chennai-600 068 |
2008 |
Phase-IA works of Civil and Electro Mechanical EPC Package for Development of Krishnapatnam Port. |
Krishnapatnam Port Company Limited, Hyderabad |
2008 |
Piling works for Part Design & Construction of Viaduct of 5.225 KM (Ch0.00 to 5.22 Km) and structural works for five station buildings on Inderlok - Mundka Corridor of Phase - II of Delhi MRTS, Contract package BC-7. |
NHAI, New Delhi |
2008 |
Piling over extended portion from Ch 3531.0 to Ch. 3748.9. |
DMRC, New Delhi |
2008 |
Civil and Structural works for Offsites for Visakh refinery clean fuels project. |
HPCL, Vizag |
2008 |
Construction of Diaphragm wall & Pile foundation for proposed JW Marriott Hotel at Chennai. |
Viceroy Hotels Limited, Hyderabad |
2008 |
Piling of Yamuna Depot including one Station & Staff quarters of Delhi MRTS project (Contract BC11-A). |
DMRC, New Delhi |
2008 |
Execution and handing over of piling works for 400/132 KV Substation at Barh in Bihar. |
BHEL, New Delhi |
2008 |
Piling work at Parsvnath Metro Station at Akshardham. |
Parsvnath Developers Ltd., |
2008 |
Piling work for DMRC Contract of Kakardooma Metro Station Project. |
SAM(I) Built Well Pvt. Ltd., Delhi |
2008 |
Piling work for Proposed Videocon IT Park. |
Shapoorji Pallonji & Co. Ltd., Kolkata |
2007 |
Pile foundation package (package - B) (Part - I) for 400KV D/C Barh - Koiwlar - Balia Transmission line associated with Barh Transmission system (ER Portion). Specification No.: C-46010-L191-3. |
PGCIL, Gurgaon |
2007 |
Construction of Plastic Concrete Diaphragm Wall for Gundlakamma Reservoir Project, Ongole, Andhra Pradesh. |
Maytas - NCC JV |
2007 |
Providing pile foundations for 220 KV VTPS - Tallapally line towers crossing Krishna river at Ibrahimpatnam near Vijayawada |
APTRANSCO, Hyderabad |
2007 |
Conducting Vertical and Lateral load tests on 1.30 metres dia bored cast in situ pile on the River bank Vridha Gouthami branch of River Godavari near G Moolapalem in East Godavari Dist. |
R&B Dept., Kakinada |
2007 |
Piling of Yamuna Depot including one Station & Staff quarters of Delhi MRTS project (Contract BC11-A) |
DMRC, New Delhi |
2007 |
Construction of Diaphragm wall & Pile foundation for proposed JW Marriott Hotel at Chennai |
Viceroy Hotels Limited, Hyderabad |
2007 |
Execution and Handling over of piling works for 400/132 KV Substation at Bihar in Bihar |
BHEL, New Delhi |
2007 |
Pile foundation package (package - B) for 400KV D/C Barh - Koiwlar - Balia Transmission line associated with Barh Transmission system (ER Portion). Specification No.: C-46010-L191-3. |
PGCIL, New Delhi |
2006 |
Piling works for Part Design & Construction of Viaduct of 5.225 KM (Ch0.00 to 5.22 Km) and structural works for five station buildings on Inderlok - Mundka Corridor of Phase - II of Delhi MRTS, Contract package BC-7 |
IDEB - SUCG JV, Delhi |
2006 |
Contract 3C47A - Piling works including Pile cap for Pragati Maidan & Indraprastha Stations on Extension of Line-3 of Delhi MRTS Project.. |
DMRC, New Delhi |
2006 |
Pile foundations Packages B1 & B2 for river crossing location for 400KV D/C Patna - Balia transmission Line associated with Kahalgaon - II, Phase - I Transmission system |
PGCIL, Gurgaon |
2006 |
Design and Construct Contract for Design and Construction of underground portion of Viswa Vidyalaya - Jahagirpuri of DMRC contract BC-2 |
|
2006 |
Piling over extended portion from Ch. 3531.00 to Ch. 3748.9 |
DMRC, New Delhi |
2005 |
Piling and pile cap works for
2nos. crude tanks at additional tankage project site of
Visakha Refinery |
HPCL, Vizag |
2005 |
Providing Pile Foundations including
pile caps and tie beams for 220 / 132 KVA Bihar sub-transmission
project |
TATA Power Co. Ltd., Kolkatta |
2005 |
Construction of Diaphragm wall,
Anchored earth retaining wall and earth work for Sabarmati
River Front Development |
S R F D C L Ahmedabad |
2005 |
Protection works at Prakasam Barrage
by Providing Z-sheet piles, Rough stone apron , Sand sluicing
etc |
Irrigation Department AP |
2005 |
Pile foundations Package B for transmission Line associated with Eastern Region System Strengthening Scheme. |
PGCIL, Gurgaon |
2004 |
Piling works for S G Area civil
works package for Vindyachal Super Thermal Power Project
Stage III of N T P C |
HSCL, Kolkatta |
2004 |
Providing Pile Foundations including
pile caps and tie beams for 400 KV Vemagiri - Kothapet
DC line transmission towers crossing River Godavari at
Ravulapalem near Rajmundhry |
APTRANSCO, Hyderabad |
2004 |
Pile foundation package for River
crossing tower locations for 400 KV DC Mainpuri - Ballabgarh
Transmision Line |
PGCIL, New Delhi |
2004 |
Construction of Marine and Land
piles for conveyor and junction houses |
South West Port Ltd., Mormugao |
2003 |
|
KSHI , New Delhi |
2003 |
|
South Eastern Railway, Sambalpur |
2003 |
Providing Pile Foundations including
pile caps and tie beams for 220 KV DC line transmission
towers crossing River Godavari near Sir Arthur Cotton
Barrage at Dowlaiswaram |
APTRANSCO, Hyderabad |
2003 |
Providing Pile Foundations including
pile caps and tie beams for 400 KV DC line transmission
towers crossing River Godavari at Vemagiri near Rajmundhry |
APTRANSCO, Hyderabad |
2001 |
|
TATA Projects, Hyderabad |
2001 |
|
Jyothi Structures, Nasik |
2001 |
Pile Foundations for 400 KV DC
line Transmission Towers across River Godavari |
APTRANSCO, Hyderabad |
2001 |
|
I-Max Entertainments, Hyderabad |
2000 |
Installation of Piles and related
Civil and Structural works for second Atmospheric Ammonia
Storage Tank |
Coramandel Fertilizer Ltd, Vizag |
2000 |
|
IOCL, Chennai |
2000 |
|
APTRANSCO, Hyderabad |
1999 |
Installation of 1500 mm dia Vertical
and Raker RCC Pile foundations for strengthening of NH-1,
Karnal - Ambala Road, Haryana (World Bank Project) |
NHAI, New Delhi |
1999 |
Soil Densification by Stone Column
method for Tank Foundations |
HPCL, Vizag |
1999 |
|
APSEB, Hyderabad |
1999 |
Installation of 100,000 RM of
Bored cast insitu piles and Civil construction work of
External Coat Handling System (ECHS) of North Chennai
Thermal Power Station, Tamilnadu Electricity Board, Chennai |
MECON, Bihar |
1999 |
Entire Civil works
including Pile foundaions for Package - 4 of IOTL |
Rotary MEC Engineers,
Singapore |
1998 |
|
MRL, Chennai |
1998 |
Installation of Bored Piles and
civil works for Tank Foundations |
IOTL, Navghar |
1998 |
|
HPCL, Vizag |
1998 |
|
MRL, Chennai |
1998 |
|
COBRA S.A., Spain |
1998 |
|
APSEB, Hyderabad |
1997 |
|
Bangalore |
1997 |
|
MRL, Chennai |
1996 |
|
Sardar Sarovar Narmada
Nigam Gujarat |
1995 |
|
DGNP, Vizag |
1995 |
|
PGCIL, New Delhi |
1995 |
Provision of Pile
Foundation for Horton Spheres and LPG Bullets |
Sri Sakthi LPG Ltd., Kakinada |
1995 |
Provision of Pile Foundation for
HQ ENC Building at Visakhapatnam |
CE, Dry Dock, Vizag |
1993 |
|
Sardar Sarovar Narmada
Nigam, Gujarat |
1992 |
Construction of Rammed Stone Columns
RC bored cast insitu RCC piles for LSHS/Tank Wagon Gantries |
HPCL, Vizag |
1992 |
|
MRL, Chennai |
1991 |
|
AP Irrigation |
1989 |
|
CE, Drydock, Vizag |
1989 |
|
DGNP, Vizag |